0
0
Watch list
was added to the project list.
×

Accessories for LED façade floodlights

Connection box · Wall outrigger arm · Extension cables


A separate connection box is required for the electrical connection to the BEGA LED façade floodlight. For installation in series (max. 12 luminaires per connection), you only need a connection box for the first luminaire. Simple 5-pole plug connectors are used for the electrical connection to the next luminaire.

To bridge larger distances, we can supply connection cables of various lengths which are ready for connection. The connection cable 71 037 can also be used as a maintenance cable.

The wall outrigger arm 71 036 allows façade mounting of the luminaires. For installation with wall outrigger arms please order connection box 71 064.

Connection box with terminals 5 x 2.5

  A B C
70 555   Connection box 250 55 45
 
71 064   Connection box for wall outrigger arm 160 65 75
71 036   Wall outrigger arm for façade floodlight 255 45 60
71 036 A   Wall outrigger arm for façade floodlight 255 45 60
 
71 037   Extension cable 2 m
70 556   Extension cable 5 m
70 557   Extension cable 10 m

BEGA Library

BEGA Library is a collection of digital publications from Lichtgruppe Gantenbrink. Learn more about our products, discover examples of impressive applications, and watch our high-definition videos.
Learn more

BEGA AR

BEGA AR is pleased to help you assess our luminaires in your own private setting. In a virtual presentation you can place up to five different luminaires simultaneously in any positions you like: in the house, around the house or in the garden. You can then view them from all angles, switching them on and off and even taking photos ofthe various scenes.
Learn more

Electrical safety

The luminaires in this catalogue are designed and produced on the basis of the EN 60598/VDE 0711 standards. The majority of the luminaires bear the relevant test mark on the type plate as well as on the packaging and instructions for use. The other luminaires have been or will be submitted for certification, but the certification and approval procedure is still in progress. We can provide information on the status of the certification procedure at any time. Special orders are produced in accordance with the above set of regulations.
Learn more